10M HDMI Cable v1.4 by True HQ™ | HIGH SPEED Long Lead with Ethernet ARC 3D | Full HD 1080P PS4 Xbox One Sky HD TV Laptop PC Monitor CCTV | Black & Gold Plated

SALE PRICE: £11.99

About this item

    This fits your .
  • by entering your model number.
  • [10 METER HDMI CABLE] – High-Speed HDMI to HDMI 1.4a Long Lead with Ethernet and ARC (Audio Return Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. NOT SUITABLE for 4K 2160p resolutions at 60Hz.
  • [QUALITY MATERIALS] – Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or office. With a durable PVC jacket for easy routing in challenging areas
  • [WIDE COMPATIBILITY] – These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Virgin Media HD and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Freesat, Freeview, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when resolution in set higher than 1080p.
  • [HIGH SPECIFICATION] – Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Return Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • [PREMIUM SERVICE] – Our cables have a 2-year extended warranty as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer service. In the unlikely event there is a problem then don’t hesitate to contact us, and we will be happy to make things right

Product Description

High Quality Long HDMI 1.4 Cables

True HQ – When Quality Matters!

Our extra long high-speed HDMI 1.4 leads are durable, flexible and perfect for long runs around the house and office. No picture degradation at longer lengths.

Built using high quality materials these cables deliver the required bandwidth needed to meet the full HDMI 1.4v specifications. These include Ethernet, CEC, 3D and ARC (Audio Return Channel) Support.

Resolutions from 720p, 1080i and 1080p at 60Hz.

A perfect match for CCTV, Gaming Consoles, SKY HD TV and Virgin Media HD, Multi-Room TV, PC, Laptops, Projectors and much more.

These cables will NOT WORK at 4K (3840 x 2160) 60Hz. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when resolution in set higher than 1080p.

High Specifications. Compatible with any HDMI device!

Our HDMI 1.4a cables are packed with high specifications and are compatible with any HDMI.

HDMI Ethernet Channel – Adds high-speed networking to an HDMI link, allowing users to take full advantage of their IP-enabled devices without a separate Ethernet cable.

Audio Return Channel – Allows an HDMI-connected TV with a built-in tuner to send audio data "upstream" to a surround audio system, eliminating the need for a separate audio cable.

3D – Defines input/output protocols for major 3D video formats, paving the way for true 3D gaming and 3D home theater applications.

Content Type – Real-time signaling of content types between display and source devices, enabling a TV to optimize picture settings based on content type

Additional Color Spaces – Adds support for additional color models used in digital photography and computer graphics.

Perfect for long runs. Multiple lengths available!

Our cables are ideal for extending your HDMI signal to other areas of the home or office.

We have multiple long lengths available from 10m, 15m, 20m, 25m and 30m.

Customers use our cables for various set ups, which include:

  • Office conference rooms and display screens
  • Reception TV's
  • Extending to other areas of the house and office
  • CCTV
  • Sky and Virgin TV (only at 1080p – not SKY Q at 2160p etc)
  • Xbox one and PS4 games consoles
  • Projectors

Questions and Answers

Q: What version is this HDMI cable?

A: These are HDMI 1.4a cables. With a bandwidth speed of 10.2Gbps.

Q: Do these cables work with a 4K TV

A: They will work on a 4K TV if the device used to connect to the TV is outputting a 1080p resolution. For example a 1080p Blu-Ray Player or Standard Sky HD Box – these will work fine. They WILL NOT work if you are connecting a device to the TV using a 2160P resolution, for example 4K Blu-Ray Player or PS4 Pro.

Q: Will these cables work with SKY and Virgin TV?

A: Absolutely but only at 1080p. Does not work with Sky Q at 4K 2160p resolution. You would need to set Sky Q resolution to 1080p and then it will work. Please do note this.

Q: Do they support ARC?

A: Yes they have full support for ARC (Audio Return Channel)

Q: Do these work with Dolby Atmos?

A: Yes they do.

Q: Can this cables work from a Laptop to a Projector

A: Yes they will work fine but please make sure the resolution is set no higher than 1080p at 60Hz.

Q: Will these work on an Xbox or PS4 games console?

A: Yes they will. Only at 1080p. Will not work with PS4 Pro and Xbox One X with resolution set to 2160p.

Q. Are these cables suitable for running outside?

A: No, these cables are not waterproof. You can run outside but would need to protect them in weatherproof trunking.

SKU: B07TK23YTS
Dimensions: 24.2 x 21 x 5.7 cm; 580 Grams
Manufacture: True HQ
Reference: TRUEHQ-HDMI-10M